Temelin-1 reactor unit commissioning and start-up

Creators

  • 1. Temelin Nuclear Power Plant, Temelin (Czech Republic)

Description

The Temelin-1 commissioning process was affected substantially by the change in the Czech political situation in 1989. The effects thereof were both favourable and unfavourable. Among favourable effects are the replacement of the original Instrumentation and Control System by a more advanced system and design changes which have brought about additional improvement of the Temelin NPP design safety, although on the other hand, this had an adverse impact on the time span and price of the power plant construction. Additional adverse effects included an unstable political and economic situation, associated with frequent changes in the management of the utility CEZ, a.s. (owner of the plant) as well as frequent replacement of persons in the position of the managing director of the Temelin plant itself. Despite all the difficulties encountered, Temelin-1 reactor unit could be ultimately put into trial operation in June 2002. (author)

Additional details

Additional titles

Original title (Czech)
Proces spousteni prvniho bloku jaderne elektrarny Temelin

Publishing Information

Journal Title
Bezpecnost Jaderne Energie
Journal Volume
10
Journal Issue
9-10
Journal Page Range
p. 300-316
ISSN
1210-7085

Optional Information

Notes
2 tabs., 2 figs. English translation can be ordered from Nuclear Information Center Zbraslav, 156 16 Prague-Zbraslav, Czech Republic (e-mail: uji@uji.cz), at USD 10.00 per standard page (1800 characters)