Published June 1991 | Version v1
Report Open

TA-2 Water Boiler Reactor Decommissioning Project

Description

This final report addresses the Phase 2 decommissioning of the Water Boiler Reactor, biological shield, other components within the biological shield, and piping pits in the floor of the reactor building. External structures and underground piping associated with the gaseous effluent (stack) line from Technical Area 2 (TA-2) Water Boiler Reactor were removed in 1985--1986 as Phase 1 of reactor decommissioning. The cost of Phase 2 was approximately $623K. The decommissioning operation produced 173 m3 of low-level solid radioactive waste and 35 m3 of mixed waste. 15 refs., 25 figs., 3 tabs

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE91013624; NTIS; INIS; US Govt. Printing Office Dep.

Files

22085804.pdf

Files (1.0 MB)

Name Size Download all
md5:ab4749e903ed5679620a2f8c4a74b03c
1.0 MB Preview Download

Additional details

Additional titles

Subtitle (English)
Final project report

Publishing Information

Imprint Pagination
49 p.
Report number
LA--12049

Optional Information

Contract/Grant/Project number
Contract W-7405-ENG-36
Funding organization
USDOE, Washington, DC (USA).