The LANSCE RICE control system upgrade

Description

The LANSCE (Los Alamos Neutron Science Center) control system upgrade program continues with the impending replacement of the RICE (Remote Instrumentation and Control Equipment) subsystem. The RICE subsystem upgrade is a challenge because of its technology (late 1960s), number of channels (>10,000), and unique characteristics (all-modules data takes, timed/flavored data takes). The plan is to replace at least the non-timed data and the command portions of the subsystem with Programmable Logic Controllers (PLCs). We discuss motivations, technological challenges, proof-of-principle, and planning. The boundary condition, as usual, is that we must implement these major changes on a running accelerator.

Additional details

Publishing Information

Imprint Pagination
4 p.
Report number
LA-UR--03-2758

Conference

Title
Particle Accelerator Conference
Acronym
PAC 2003
Dates
12-16 May 2003
Place
Portland, OR (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
41118957
Subject category
S43: PARTICLE ACCELERATORS; S46: INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND TECHNOLOGY;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BOUNDARY CONDITIONS; CONTROL EQUIPMENT; CONTROL SYSTEMS; LOS ALAMOS; NEUTRONS; PLANNING; REMOTE CONTROL
Descriptors DEC
BARYONS; CONTROL; DEVELOPED COUNTRIES; ELEMENTARY PARTICLES; EQUIPMENT; FERMIONS; HADRONS; NEW MEXICO; NORTH AMERICA; NUCLEONS; URBAN AREAS; USA

Optional Information