Published November 1986
| Version v1
Journal article
Preassembly method for construction of nuclear power station
Description
Recently preassembly method for construction are generally popular in Japan and this trend is prevailing all over the world. They provide good solutions to the problems that the Japanese construction industry faces and also they meet the needs for construction of nuclear power plants having heavily reinforced concrete structures. We have already established basic technologies for the methods, developing more advanced methods (more systematic, larger sized, more applicable, etc.). In the near future, they will be further developed up to a complete system called 'Industrialized construction method'. This system will include the use of precast concrete component, steel concrete composit structures and construction robots. (author)
Additional details
Publishing Information
- Journal Title
- FAPIG (Tokyo)
- Journal Issue
- no.114
- Series
- FAPIG (Tokyo).
- ISSN
- 0014-5645
- CODEN
- FPIGA
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 18082968
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- CONCRETES; CONSTRUCTION; COST ESTIMATION; MODULAR STRUCTURES; NUCLEAR POWER PLANTS; PLANNING; QUALITY CONTROL
- Descriptors DEC
- BUILDING MATERIALS; CONTROL; MATERIALS; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS