Analysis of Defective Pipings in Nuclear Power Plants and Applications of Guided Ultrasonic Wave Techniques
Creators
- 1. Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)
- 2. Korea Advanced Inspection Technology INC., Daejeon (Korea, Republic of)
Description
In order to apply the guided ultrasonic techniques to the pipes in nuclear power plants, the cases of defective pipes of nuclear power plants, were investigated. It was confirmed that geometric factors of pipes, such as location, shape, and allowable space were impertinent for the application of guided ultrasonic techniques to pipes of nuclear power plants. The quality of pipes, supports, signals analysis of weldment/defects, acquisition of accurate defects signals also make difficult to apply the guided ultrasonic techniques to pipes of nuclear power plants. Thus, a piping mock-up representing the pipes in the nuclear power plants were designed and fabricated. The artificial flaws will be fabricated on the piping mock-up. The signals of guided ultrasonic waves from the artificial flaws will be analyzed. The guided ultrasonic techniques will be applied to the inspection of pipes of nuclear power plants according to the basis of signals analysis of artificial flaws in the piping mock-up
Availability note (English)
Available from INIS in electronic form; Also available from Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)Files
37122410.pdf
Files
(5.3 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:b2deff60c75098cd8f85d6875e30f996
|
5.3 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 118 p.
- Report number
- KAERI/TR--3219/2006
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 37122410
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- DEFECTS; MOCKUP; NUCLEAR POWER PLANTS; PIPES; SIGNALS; ULTRASONIC WAVES
- Descriptors DEC
- NUCLEAR FACILITIES; POWER PLANTS; SOUND WAVES; STRUCTURAL MODELS; THERMAL POWER PLANTS; TUBES
Optional Information
- Notes
- 11 refs, 33 figs, 9 tabs