Parametric design of remove operation for in-core instrumentation detectors

  • 1. National Key Laboratory of Reactor System Design Technology, Nuclear Power Institute of China, Chengdu (China)

Description

In order to improve the efficiency of dismantlement operation of in-core instrumentation detectors, reduce the operation time and occupancy time of polar crane, kinematic models of the main dismantlement equipment and polar crane are established respectively. Based on the certain logical relationship, general formulas for total time of dismantlement operation of 4 detectors in a group are derived, which verifies the total time requirements are meet. Meanwhile with the known operation parameters, the key parameter to the total time are researched. (authors)

Additional details

Publishing Information

Journal Title
Chinese Journal of Nuclear Science and Engineering
Journal Volume
40
Journal Issue
2
Journal Page Range
p. 341-348
ISSN
0258-0918

INIS

Country of Publication
China
Country of Input or Organization
China
INIS RN
55067898
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Descriptors DEI
CRANES; DESIGN; EFFICIENCY; REACTOR CORES; REACTOR INSTRUMENTATION; REMOVAL
Descriptors DEC
EQUIPMENT; MATERIALS HANDLING EQUIPMENT; REACTOR COMPONENTS; REMOTE HANDLING EQUIPMENT

Optional Information

Notes
6 figs., 4 tabs., 5 refs.