Published December 19, 1988 | Version v1
Report Restricted

Signal validation in nuclear power plants: Progress report No. 7

Description

This report summarizes the progress in the US Department of Energy sponsored project on Signal Validation for Nuclear Power Plants for the period September--December, 1988. The annual report for the period September 30, 1987--September 29, 1988, was submitted to the US Department of Energy. Several papers, related to the work performed under the project, have been presented at the ANS/ENS International Conference, Washington, DC and at the IEEE Conference on Decision and Control, Austin, Texas. Two sets of EBR-II data base have been acquired and are being used for testing the integrated signal validation system. A preliminary demonstration of the integrated signal validation system is operational in the Micro VAX-II workstation. 12 figs

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A03/MF A01 - OSTI; 1 as DE89004740.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
19 p.
Report number
DOE/NE/37959--25

Optional Information

Notes
Portions of this document are illegible in microfiche products.