Published 2016 | Version v1
Miscellaneous

Current status of Nigeria Research Reactor-1 (NIRR-1); after twelve years of operation

  • 1. Veritas Univ., Dept. of Pure and Applied Physics, Abuja (Nigeria)
  • 2. Ahmadu Bello Univ., Centre for Energy Research and Training, Zaria (Nigeria)

Description

Recently, experiment was conducted to know the available core excess reactivity in NIRR-1 after over 11 years of operation and was found to have depleted to 2.95 mk. Also, full power experiment conducted revealed that the reactor was only able to operate for 1 hour 40 minutes at full power before critical rod position reached the rod limiting position set at 220 mm and the reactor neutron flux began to decrease. It was observed that the reactor could not be operated continuously for 5 hours during a day to meet the demand of users. Hence, the need for beryllium shim addition. (author)

Part of:
Next generation small reactors and research reactors. 4. International Technical Meeting on Small Reactors (ITMSR-4)

Additional details

Publishing Information

Publisher
Canadian Nuclear Society
Imprint Place
Toronto, Ontario (Canada)
ISBN
978-1-926773-25-4
Imprint Title
Next generation small reactors and research reactors. 4. International Technical Meeting on Small Reactors (ITSMR-4)
Imprint Pagination
50.1 Megabytes
Journal Page Range
[4 p.]

Conference

Title
4. International Technical Meeting on Small Reactors
Acronym
ITSMR-4
Dates
2-4 Nov 2016
Place
Ottawa, Ontario (Canada)

Optional Information

Notes
4 refs., 2 figs.