Published February 2, 2015 | Version v1
Journal article

Time cycle calculation procedure for the special crew during the mining mobile machine complex operation

  • 1. Department of Oil and Gas Storage and Transportation, Institute of Natural Resources, National Research Tomsk Polytechnic University Tomsk (Russian Federation)

Description

The relevance of the research is specified by the necessity to optimize the delft mobile tunneling equipment operation. Target of the research is tunneling time cycle justification for the special crew during the mining mobile machine complex operation. Methods of the research included the consideration of operation organization schemes in the drifting face and effective use of the mobile equipment during mine exploratory working operations. Time cycle calculation procedures for major processes have been considered. This has been done for the special crew during the mobile machine complex operations for several working faces and various organization schemes

Availability note (English)

Available from http://dx.doi.org/10.1088/1755-1315/24/1/012034

Additional details

Publishing Information

Journal Title
IOP Conference Series: Earth and Environmental Science (EES)
Journal Volume
24
Journal Issue
1
Journal Page Range
[5 p.]
ISSN
1755-1315

Conference

Title
Conference on Scientific and Technical Challenges in the Well Drilling Progress
Dates
24-27 Nov 2014
Place
Tomsk (Russian Federation)

INIS

Country of Publication
United Kingdom
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
47054231
Subject category
S61: RADIATION PROTECTION AND DOSIMETRY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
DRILLING EQUIPMENT; MECHANICAL ENGINEERING; TUNNELING MACHINES; UNDERGROUND MINING
Descriptors DEC
ENGINEERING; EQUIPMENT; MINING