Published February 2, 2015
| Version v1
Journal article
Time cycle calculation procedure for the special crew during the mining mobile machine complex operation
Creators
- 1. Department of Oil and Gas Storage and Transportation, Institute of Natural Resources, National Research Tomsk Polytechnic University Tomsk (Russian Federation)
Description
The relevance of the research is specified by the necessity to optimize the delft mobile tunneling equipment operation. Target of the research is tunneling time cycle justification for the special crew during the mining mobile machine complex operation. Methods of the research included the consideration of operation organization schemes in the drifting face and effective use of the mobile equipment during mine exploratory working operations. Time cycle calculation procedures for major processes have been considered. This has been done for the special crew during the mobile machine complex operations for several working faces and various organization schemes
Availability note (English)
Available from http://dx.doi.org/10.1088/1755-1315/24/1/012034Additional details
Identifiers
Publishing Information
- Journal Title
- IOP Conference Series: Earth and Environmental Science (EES)
- Journal Volume
- 24
- Journal Issue
- 1
- Journal Page Range
- [5 p.]
- ISSN
- 1755-1315
Conference
- Title
- Conference on Scientific and Technical Challenges in the Well Drilling Progress
- Dates
- 24-27 Nov 2014
- Place
- Tomsk (Russian Federation)
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 47054231
- Subject category
- S61: RADIATION PROTECTION AND DOSIMETRY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- DRILLING EQUIPMENT; MECHANICAL ENGINEERING; TUNNELING MACHINES; UNDERGROUND MINING
- Descriptors DEC
- ENGINEERING; EQUIPMENT; MINING