Published September 2015 | Version v1
Book

The realignment of the beamline for J-PARC 3GeV RCS

  • 1. Japan Atomic Energy Agency, J-PARC Center, Tokai, Ibaraki (Japan)

Description

J-PARC 3-GeV RCS suffered from the misalignments of several millimeters of the magnets in both horizontal and vertical directions caused by the Tohoku Region Pacific Coast Earthquake on 11th March, 2011. As the result of the orbit calculation showed that the beam loss was acceptable for beam operation at 300 kW, beam operation with the current placement was implemented until May, 2013. However according to the beam loss simulation, the beam loss increased and the horizontal emittance expanded at 1 MW operation. The collimator aperture of RCS was designed at 324 π mm mrad. The ring acceptance of RCS is 486 π mm mrad. The ring acceptance can secure good collimation efficiency of 97% by taking the aperture ratio which is 1.5 times of collimator aperture. The realignment of the RCS beamline must secure ring acceptance in order to perform the 1 MW operation. In this paper, the alignment results of the magnets and the ceramic chambers that constitute the beamline of 3-GeV RCS are reported. (author)

Availability note (English)

Available from http://dx.doi.org/10.7566/JPSCP.8.012016
Part of:
Proceedings of the 2nd international symposium on science at J-PARC. Unlocking the mysteries of life, matter and the universe

Additional details

Identifiers

Publishing Information

Publisher
Physical Society of Japan
Imprint Place
Tokyo (Japan)
ISBN
978-4-89027-112-2
Imprint Title
Proceedings of the 2nd international symposium on science at J-PARC. Unlocking the mysteries of life, matter and the universe
Imprint Pagination
1360 p.
Journal Page Range
p. 012016.1-012016.6

Conference

Title
2. international symposium on science at J-PARC
Dates
12-15 Jul 2014
Place
Tsukuba, Ibaraki (Japan)

INIS

Country of Publication
Japan
Country of Input or Organization
Japan
INIS RN
48005462
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ALIGNMENT; APERTURES; BEAM CURRENTS; BEAM EMITTANCE; BEAM EXTRACTION; BEAM FOCUSING MAGNETS; BEAM INJECTION; COLLIMATORS; EARTHQUAKES; J-PARC; LINAC-RING ACCELERATORS; SIMULATION; VACUUM SYSTEMS
Descriptors DEC
ACCELERATORS; CURRENTS; EQUIPMENT; JAPANESE ORGANIZATIONS; MAGNETS; NATIONAL ORGANIZATIONS; OPENINGS; SEISMIC EVENTS

Optional Information

Notes
3 refs., 6 figs., 1 tab.