First experiences with the LHC BLM sanity checks
- 1. CERN, CH-1211 Geneve 23 (Switzerland)
Description
The reliability concerns have driven the design of the Large Hardron Collider (LHC) Beam Loss Monitoring (BLM) system from the early stage of the studies up to the present commissioning and the latest development of diagnostic tools. To protect the system against non-conformities, new ways of automatic checking have been developed and implemented. These checks are regularly and systematically executed by the LHC operation team to ensure that the system status is after each test as good as new. The sanity checks are part of this strategy. They are testing the electrical part of the detectors (ionisation chamber or secondary emission detector), their cable connections to the front-end electronics, further connections to the back-end electronics and their ability to request a beam abort. During the installation and in the early commissioning phase, these checks have shown their ability to find also non-conformities caused by unexpected failure event scenarios. In every day operation, a non-conformity discovered by this check inhibits any further injections into the LHC until the check confirms the absence of non-conformities.
Availability note (English)
Available from http://dx.doi.org/10.1088/1748-0221/5/12/C12044Additional details
Identifiers
Publishing Information
- Journal Title
- Journal of Instrumentation
- Journal Volume
- 5
- Journal Issue
- 12
- Journal Page Range
- p. C12044
- ISSN
- 1748-0221
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 43019906
- Subject category
- S46: INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND TECHNOLOGY;
- Descriptors DEI
- BEAM MONITORING; BEAMS; CERN LHC; COMMISSIONING; ELECTRIC CABLES; INSTALLATION; IONIZATION CHAMBERS; RELIABILITY; SECONDARY EMISSION DETECTORS; TESTING
- Descriptors DEC
- ACCELERATORS; CABLES; CONDUCTOR DEVICES; CYCLIC ACCELERATORS; ELECTRICAL EQUIPMENT; EQUIPMENT; MEASURING INSTRUMENTS; MONITORING; RADIATION DETECTORS; STORAGE RINGS; SYNCHROTRONS