Zeepipe construction progresses toward 1993 start-up

  • 1. Statoil Stavanger (Norway)

Description

This paper reports that first-phase construction on the longest and largest pipeline ever laid in the North Sea will peak this year with completion of pipelaying and tie-ins. Phase 1 of the Zeepipe transportation system (ZTS) targets full gas delivery to the Belgian port of Zeebrugge on October 1, 1993. Start-up and partial delivery of first gas to the terminal will occur somewhat earlier, based on current negotiations with buyers. More than 390 miles of 30 and 40-in. pipeline were laid between April 12 and September 16, 1991. This work included 0.93 miles of 40-in. at the Sleipner field, 366.8 miles of 40-in. between Sleipner and Zeebrugge, and 24.2 miles of 30-in. To connect Zeepipe at Sleipner to the Statpipe system at the nearby 16/11-S platform. Pipelay contractors are currently at work on 143 miles of 20-in. line to connect Sleipner to Karsto and on the final leg between Sleipner and Zeebrugge, 135.4 miles of 40 in. When pipelaying operations are completed this year, 670 miles of 20, 30, and 40-in. pipeline will have been laid since April 1991

Additional details

Publishing Information

Journal Title
Oil and Gas Journal
Journal Volume
90
Journal Issue
8
Series
Oil Gas J.
Journal Page Range
94-104
ISSN
0030-1388
CODEN
OIGJA

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
23068372
Subject category
S03: NATURAL GAS;
Descriptors DEI
CONTRACTS; MARKET; NATURAL GAS; NATURAL GAS INDUSTRY; NATURAL GAS WELLS; NORTH SEA; OPERATION; PERSONNEL; PIPELINES; TRANSPORT
Descriptors DEC
ATLANTIC OCEAN; ENERGY SOURCES; FLUIDS; FOSSIL FUELS; FUEL GAS; FUELS; GAS FUELS; GASES; INDUSTRY; SEAS; SURFACE WATERS; WELLS