Published 1992 | Version v1
Report Open

Ames Laboratory Site Environmental Report, Calendar year 1992

Description

The summarized data and conclusions from the Ames Laboratory environmental monitoring program are presented in this Annual Site Environmental Report. Pollution awareness and waste minimization programs and plans implemented in 1990 are continuing to date. Ames Laboratory (AL) is responsible for a small chemical burial site, located on ISU property. The site was used for the disposal of chemical and metal slags from thorium and uranium production. Samples of water from existing test wells, and upstream and downstream sites on the nearby Squaw Creek, have not detected migration of the buried materials off site. Surface, hand auger and deep boring soil samples have been collected from the site. The analytical results are pending, Six new monitoring wells have been installed and sampled. Analytical results are pending. Ames Laboratory is responsible for an area contaminated by diesel fuel that leaked from an underground storage tank (UST) in 1970. The tank was removed that year. Soil borings and groundwater have been analyzed for contamination and a preliminary assessment written. Nine small inactive waste sites have been identified for characterization. The NEPA review for this work resulted in a CX determination. The work plans were approved by AL and CH. A subcontractor has surveyed and sampled the sites. Analytical results are pending

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE94000668; NTIS; US Govt. Printing Office Dep.

Files

25025067.pdf

Files (2.2 MB)

Name Size Download all
md5:6cf391588f01ad101aa9c92290978a95
2.2 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
30 p.
Report number
IS--5098

Optional Information

Contract/Grant/Project number
Contract W-7405-ENG-82
Funding organization
USDOE, Washington, DC (United States).