Published 1975 | Version v1
Report Restricted

Design and fabrication of the second HEDL instrumented control materials irradiation test assembly (BICM-2)

Description

A second instrumented control materials irradiation test assembly has been designed and fabricated by HEDL for insertion in the EBR-II reactor. The objective of this experiment is to obtain critical absorber material performance data needed for analysis of LMFBR control assemblies. This test will extend the information gained from the first instrumented control materials experiment (BICM-1) which has recently completed irradiation in the EBR-II

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Augmented title (English)
LMFBR

Publishing Information

Imprint Pagination
11 p.
Report number
HEDL-SA--793

Conference

Title
American Nuclear Society meeting.
Dates
8 Jun 1975.
Place
New Orleans, Louisiana, USA.

Optional Information

Notes
Available from NTIS. $3.50.
Secondary number(s)
CONF-750607--53.