Published 1995 | Version v1
Book

Which evolutions in Europe in the conception of fast reactors?

Creators

  • 1. Societe Franco-Americaine de Constructions Atomiques (FRAMATOME), 92 - Paris-La-Defense (France)

Description

The European Fast Reactor (EFR) project, which started in 1988, has reached an important step in 1993 with the achievement of the conception validation phase. This step has demonstrated the feasibility of the two main objectives requested by the electric power producers: the economic objective of competitiveness of the kilowatt-hour cost for a serial EFR unit with respect to a PWR unit of the same age, and a technical objective of conformity with the most ambitious safety rules considered in future electronuclear units, allowing its building in any of the participating countries. Important research and development programs have allowed to validate the characteristics necessary to reach these objectives. This paper presents the main technical improvements performed from the Superphenix concept to reach the EFR objectives. (J.S.). 12 figs

Part of:
Fast neutron reactors: which future, which stakes?

Additional details

Additional titles

Original title (French)
Quelles evolutions en Europe de la conception des reacteurs rapides?

Publishing Information

Publisher
EUROFORUM.
Imprint Place
Paris (France)
Imprint Title
Fast neutron reactors: which future, which stakes?
Imprint Pagination
348 p.
Journal Page Range
p. 1-15.

Conference

Title
Seminar on Fast Neutron Reactors.
Original Conference Title
Seminaire sur les Reacteurs a Neutrons Rapides
Dates
25-26 Jan 1995.
Place
Paris (France).

Optional Information

Notes
Imprint:Les reacteurs a neutrons rapides. Quel avenir, quels enjeux?.