Published 1983
| Version v1
Book
Neutral beam power supply timing interlocks
- 1. GA Technologies Inc., San Diego, CA
Description
This paper describes interlocks and timing for GA Technologies Neutral Beam Power Systems (NBPS). Each NBPS requires timing signals which fire the Filament, Arc, Suppressor, Gas and Modulator/Regulator (M/R). The M/R output accelerates the primary hydrogen beam. Each of these timing signals is interlocked in a similar manner. This paper concentrates on the interlocking of the M/R as a representative example. A figure shows how the M/R timing channel is derived and conditioned by an enable and various interlocks to yield a signal which gates on the M/R
Additional details
Publishing Information
- Publisher
- I.E.E.E.
- Imprint Place
- New York, NY (USA)
- Imprint Title
- Fusion engineering. Vol. 1
- Journal Page Range
- p. 492-495.
Conference
- Title
- 10. symposium on fusion engineering.
- Dates
- 5-9 Dec 1983.
- Place
- Philadelphia, PA (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 16028607
- Subject category
- S70: PLASMA PHYSICS AND FUSION TECHNOLOGY; S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- FILAMENTS; HYDROGEN; NEUTRAL ATOM BEAM INJECTION; POWER SUPPLIES; SIGNALS; TIMING CIRCUITS
- Descriptors DEC
- BEAM INJECTION; ELECTRONIC CIRCUITS; ELECTRONIC EQUIPMENT; ELEMENTS; EQUIPMENT; NONMETALS