Published 1983 | Version v1
Book

Neutral beam power supply timing interlocks

  • 1. GA Technologies Inc., San Diego, CA

Description

This paper describes interlocks and timing for GA Technologies Neutral Beam Power Systems (NBPS). Each NBPS requires timing signals which fire the Filament, Arc, Suppressor, Gas and Modulator/Regulator (M/R). The M/R output accelerates the primary hydrogen beam. Each of these timing signals is interlocked in a similar manner. This paper concentrates on the interlocking of the M/R as a representative example. A figure shows how the M/R timing channel is derived and conditioned by an enable and various interlocks to yield a signal which gates on the M/R

Additional details

Publishing Information

Publisher
I.E.E.E.
Imprint Place
New York, NY (USA)
Imprint Title
Fusion engineering. Vol. 1
Journal Page Range
p. 492-495.

Conference

Title
10. symposium on fusion engineering.
Dates
5-9 Dec 1983.
Place
Philadelphia, PA (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
16028607
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY; S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
FILAMENTS; HYDROGEN; NEUTRAL ATOM BEAM INJECTION; POWER SUPPLIES; SIGNALS; TIMING CIRCUITS
Descriptors DEC
BEAM INJECTION; ELECTRONIC CIRCUITS; ELECTRONIC EQUIPMENT; ELEMENTS; EQUIPMENT; NONMETALS