Published 2001 | Version v1
Miscellaneous Open

Icone9 Framatome paper-abstract Parry Alain PL, 838A

  • 1. Framatome and Schneider Electric to upgrade Safety systems at Dukovany Power Plant (Czech Republic)

Description

The consortium formed by Framatome and Schneider Electric has signed a contract with the Skoda JS industrial group to upgrade the safety systems in all four units at the Dukovany nuclear power plant operated by the Czech national electricity utility CEZ. The contract covers the instrumentation and control systems for reactor protection and operation under accident conditions. The four Russian-designed VVER 440-213 units, the first of which went on line 15 years ago, will be gradually upgraded between 2005 and 2009. State-of-the-art ''Spinline 3'' digital protection systems jointly developed by Framatome and Schneider Electric will be deployed. This technology was recently introduced into the Fessenheim plant in France during the second ten-year outage, and into units 3 and 4 at the Kozloduy power plant. It will also be installed next year at Tihange in Belgium and in the Qinshan plant in China. (author)

Availability note (English)

Available from INIS in electronic form

Files

33008016.pdf

Files (30.6 kB)

Name Size Download all
md5:5548642e3eb19fcf9729a06c4e39944d
30.6 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
[2 p.]
Report number
INIS-FR--654

Conference

Title
9. international conference on nuclear engineering
Dates
8-12 Apr 2001
Place
Nice, Acropolis (France)