Guidelines for the operation and closure of deep geological repositories for the disposal of high level and alpha bearing wastes

Description

The operation and closure of a deep geological repository for the disposal of high level and alpha bearing wastes is a long term project involving many disciplines. This unique combination of nuclear operations in a deep underground location will require careful planning by the operating organization. The basic purpose of the operation stage of the deep repository is to ensure the safe disposal of the radioactive wastes. The purpose of the closure stage is to ensure that the wastes are safely isolated from the biosphere, and that the surface region can be returned to normal use. During these two stages of operation and closure, it is essential that both workers and the public are safely protected from radiation hazards, and that workers are protected from the hazards of working underground. For these periods of the repository, it is essential to carry out monitoring for purposes of radiological protection, and to continue testing and investigations to provide data for repository performance confirmation and for final safety assessment. Over the lengthy stages of operation and closure, there will be substantial feedback of experience and generation of site data. These will lead both to improved quality of operation and a better understanding of the site characteristics, thereby enhancing the confidence in the ability of the repository system to isolate the waste and protect future generations. 15 refs

Availability note (English)

MF available from INIS under the Report Number.

Files

23009048.pdf

Files (469.7 kB)

Name Size Download all
md5:81d05b00031bbb3c5e504436ce903047
469.7 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
33 p.
Report number
IAEA-TECDOC--630