Published 2012 | Version v1
Report Open

Results of the 44th and 45th Nuclotron runs

Description

The total duration of the 44th (November-December 2011) and 45th (February-March 2012) runs was about 2150 h. During about 900 h the beam was used for experiments in the framework of the current program of physical investigations and for the machine development. Among more important achievements during the 44th run one can mention the deuteron beam acceleration up to a record energy of 4 GeV/u and realization of the slow beam extraction at this energy. During the 45th run the scheduled program of physical investigations including experiments with the deuteron beam (extracted and at the internal target) of energy up to 4 GeV/u was fully implemented. During the run the beam acceleration and slow extraction at 4.5 GeV/u were realized

Availability note (English)

Also available online: http://www1.jinr.ru/Preprints/2012/108(P9-2012-108).pdf

Files

44118319.pdf

Files (3.2 MB)

Name Size Download all
md5:d0b8ba3285448e4361f6c9af80399c36
3.2 MB Preview Download

System files (137.2 kB)

Name Size Download all

Additional details

Additional titles

Original title (Russian)
Итоги 44-го и 45-го сеансов Нуклотрона

Publishing Information

Imprint Pagination
45 p.
Report number
JINR-R--9-2012-108

INIS

Country of Publication
Joint Institute for Nuclear Research (JINR)
Country of Input or Organization
Joint Institute for Nuclear Research (JINR)
INIS RN
44118319
Subject category
S43: PARTICLE ACCELERATORS;
Descriptors DEI
ACCELERATION; BEAM DYNAMICS; BEAM EXTRACTION; BEAM MONITORING; DEUTERON BEAMS; FLOWSHEETS; GEV RANGE 01-10; JINR SYNCHROTRON; OPTIMIZATION; POWER SYSTEMS; STOCHASTIC COOLING; TESTING
Descriptors DEC
ACCELERATORS; BEAM COOLING; BEAMS; CYCLIC ACCELERATORS; DIAGRAMS; DYNAMICS; ENERGY RANGE; ENERGY SYSTEMS; GEV RANGE; INFORMATION; ION BEAMS; MECHANICS; MONITORING; SYNCHROTRONS

Optional Information

Notes
8 refs., 41 fig.