Published 2012
| Version v1
Report
Open
Results of the 44th and 45th Nuclotron runs
Description
The total duration of the 44th (November-December 2011) and 45th (February-March 2012) runs was about 2150 h. During about 900 h the beam was used for experiments in the framework of the current program of physical investigations and for the machine development. Among more important achievements during the 44th run one can mention the deuteron beam acceleration up to a record energy of 4 GeV/u and realization of the slow beam extraction at this energy. During the 45th run the scheduled program of physical investigations including experiments with the deuteron beam (extracted and at the internal target) of energy up to 4 GeV/u was fully implemented. During the run the beam acceleration and slow extraction at 4.5 GeV/u were realized
Availability note (English)
Also available online: http://www1.jinr.ru/Preprints/2012/108(P9-2012-108).pdfFiles
44118319.pdf
Files
(3.2 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:d0b8ba3285448e4361f6c9af80399c36
|
3.2 MB | Preview Download |
System files
(137.2 kB)
| Name | Size | Download all |
|---|
Additional details
Additional titles
- Original title (Russian)
- Итоги 44-го и 45-го сеансов Нуклотрона
Identifiers
Publishing Information
- Imprint Pagination
- 45 p.
- Report number
- JINR-R--9-2012-108
INIS
- Country of Publication
- Joint Institute for Nuclear Research (JINR)
- Country of Input or Organization
- Joint Institute for Nuclear Research (JINR)
- INIS RN
- 44118319
- Subject category
- S43: PARTICLE ACCELERATORS;
- Descriptors DEI
- ACCELERATION; BEAM DYNAMICS; BEAM EXTRACTION; BEAM MONITORING; DEUTERON BEAMS; FLOWSHEETS; GEV RANGE 01-10; JINR SYNCHROTRON; OPTIMIZATION; POWER SYSTEMS; STOCHASTIC COOLING; TESTING
- Descriptors DEC
- ACCELERATORS; BEAM COOLING; BEAMS; CYCLIC ACCELERATORS; DIAGRAMS; DYNAMICS; ENERGY RANGE; ENERGY SYSTEMS; GEV RANGE; INFORMATION; ION BEAMS; MECHANICS; MONITORING; SYNCHROTRONS
Optional Information
- Notes
- 8 refs., 41 fig.