Diagnosing the PEP-II Injection System

Description

The injection of beam into the PEP-II B-Factory, especially into the High Energy Ring (HER) has some challenges. A high background level in the BaBar detector has for a while inhibited us from trickling charge into the HER similar to the Low Energy Ring (LER). Analyzing the injection system has revealed many issues which could be improved. The injection bump between two kickers was not closed, mainly because the phase advance wasn't exactly 180o and the two kicker strengths were not balanced. Additionally we found reflections which kick the stored beam after the main kick and cause the average luminosity to drop about 3% for a 10 Hz injection rate. The strength of the overall kick is nearly twice as high as the design, indicating a much bigger effective septum thickness. Compared with single beam the background is worse when the HER beam is colliding with the LER beam. This hints that the beam-beam force and the observed vertical blow-up in the HER pushes the beam and especially the injected beam further out to the edge of the dynamic aperture or beyond

Availability note (English)

Available from http://www.slac.stanford.edu/cgi-wrap/getdoc/slac-pub-11168.pdf; http://www.slac.stanford.edu/cgi-wrap/pubpage?slac-pub-11168.html; PURL: https://www.osti.gov/servlets/purl/890841-wm6DNw/

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
SLAC-PUB--11168

Conference

Title
9. European Particle Accelerator Conference (EPAC 2004)
Dates
5-9 Jul 2004
Place
Lucerne (Switzerland)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
38003091
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; APERTURES; DESIGN; LUMINOSITY; THICKNESS
Descriptors DEC
DIMENSIONS; OPENINGS; OPTICAL PROPERTIES; PHYSICAL PROPERTIES

Optional Information

Contract/Grant/Project number
AC02-76SF00515
Funding organization
US Department of Energy (United States)