Published 2010
| Version v1
Miscellaneous
Bunch current monitor system for NewSUBARU
Creators
- 1. Japan Synchrotron Radiation Research Institute, Sayo, Hyogo (Japan)
- 2. Univ. of Hyogo, LASTI/NewSUBARU, Kamigori, Hyogo (Japan)
Description
At the NewSUBARU, so-called top-up operation has been used since June 2003. In 2009 we installed a bunch current monitor system using a digital oscilloscope. It enabled a bucket filling control to take full advantage of the top-up operation mode. We succeeded to maintain the filling pattern close to the desired by controlling beam injection. (author)
Additional details
Additional titles
- Original title (Japanese)
- Dai 7 kai nippon kasokuki gakkai nenkai
Identifiers
Publishing Information
- Imprint Title
- Proceedings of the 7th annual meeting of Particle Accelerator Society of Japan
- Imprint Pagination
- [1232 p.]
- Journal Page Range
- [3 p.]
Conference
- Title
- 7. annual meeting of Particle Accelerator Society of Japan
- Dates
- 4-6 Aug 2010
- Place
- Himeji, Hyogo (Japan)
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 44068451
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- BEAM BUNCHING; BEAM INJECTION; BEAM MONITORING; BEAM MONITORS; CONTROL SYSTEMS; ELECTRON BEAMS; STABILIZATION; STORAGE RINGS; SYNCHROTRON RADIATION SOURCES; TRIGGER CIRCUITS
- Descriptors DEC
- BEAM DYNAMICS; BEAMS; DYNAMICS; ELECTRONIC CIRCUITS; LEPTON BEAMS; MEASURING INSTRUMENTS; MECHANICS; MONITORING; MONITORS; PARTICLE BEAMS; PULSE CIRCUITS; RADIATION SOURCES
Optional Information
- Notes
- 2 refs., 5 figs., 1 tab. Imprint:Dai 7 kai nippon kasokuki gakkai nenkai