Pre-operational and start-up testing of nuclear power plants

Description

The general requirements for and regulatory control of the nuclear power plant pre-operational and start-up testing are specified in the guide. The pre-operational and start-up testing aims to demonstrate that the plant has been constructed and operates according to the design intent. In Finland the Finnish Centre for Radiation and Nuclear Safety controls the pre-operational and start-up testing of the nuclear power plants. For applicable parts the guide is also observed in the regulatory control of pre-operational and start-up testing of other nuclear facilities. (7 refs.)

Availability note (English)

MF available from INIS under the Report Number.

Files

25052592.pdf

Files (427.8 kB)

Name Size Download all
md5:1347b0b588b2455fb55287cf3bec0615
427.8 kB Preview Download

Additional details

Publishing Information

ISBN
951-47-8875-3
Imprint Pagination
11 p.
Report number
STUK/YVL-GUIDE--2.5

INIS

Country of Publication
Finland
Country of Input or Organization
Finland
INIS RN
25052592
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S99: GENERAL AND MISCELLANEOUS;
Resource subtype / Literary indicator
Translation
Descriptors DEI
FINLAND; NUCLEAR POWER PLANTS; PERFORMANCE TESTING; REACTOR START-UP; REGULATORY GUIDES
Descriptors DEC
DEVELOPED COUNTRIES; DOCUMENT TYPES; EUROPE; NUCLEAR FACILITIES; POWER PLANTS; SCANDINAVIA; START-UP; TESTING; THERMAL POWER PLANTS

Optional Information

Notes
Translation. The original text in Finnish is published under the same guide number. The guide is valid from 1 April 1991 and will remain in force until further notice. It replaces the guide YVL 2.5 issued on 30 June 1976.