Pre-operational and start-up testing of nuclear power plants
Description
The general requirements for and regulatory control of the nuclear power plant pre-operational and start-up testing are specified in the guide. The pre-operational and start-up testing aims to demonstrate that the plant has been constructed and operates according to the design intent. In Finland the Finnish Centre for Radiation and Nuclear Safety controls the pre-operational and start-up testing of the nuclear power plants. For applicable parts the guide is also observed in the regulatory control of pre-operational and start-up testing of other nuclear facilities. (7 refs.)
Availability note (English)
MF available from INIS under the Report Number.Files
25052592.pdf
Files
(427.8 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:1347b0b588b2455fb55287cf3bec0615
|
427.8 kB | Preview Download |
Additional details
Publishing Information
- ISBN
- 951-47-8875-3
- Imprint Pagination
- 11 p.
- Report number
- STUK/YVL-GUIDE--2.5
INIS
- Country of Publication
- Finland
- Country of Input or Organization
- Finland
- INIS RN
- 25052592
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S99: GENERAL AND MISCELLANEOUS;
- Resource subtype / Literary indicator
- Translation
- Descriptors DEI
- FINLAND; NUCLEAR POWER PLANTS; PERFORMANCE TESTING; REACTOR START-UP; REGULATORY GUIDES
- Descriptors DEC
- DEVELOPED COUNTRIES; DOCUMENT TYPES; EUROPE; NUCLEAR FACILITIES; POWER PLANTS; SCANDINAVIA; START-UP; TESTING; THERMAL POWER PLANTS
Optional Information
- Notes
- Translation. The original text in Finnish is published under the same guide number. The guide is valid from 1 April 1991 and will remain in force until further notice. It replaces the guide YVL 2.5 issued on 30 June 1976.