Leibstadt nuclear power station in operation: experience and consequences for future nuclear plant projects
Creators
- 1. Nuclear Power Plant Sector, Brown, Boveri and Co. Ltd., Baden, Switzerland
- 2. Brown, Boveri und Co. Ltd., Baden (Switzerland)
Description
The Leibstadt nuclear power station was handed over to the customer for commercial operation in December 1984. Due to its exceptional performance the plant's net rating was raised from 942 MW to 990 MW. The authors describe the experience gained during the final construction period, during commissioning and in the first 18 months of operation. The main reasons for the projected cost and schedule being exceeded are discussed, together with lessons learned and conclusions to be drawn for future projects. (Auth.)
Additional details
Publishing Information
- Journal Title
- Brown Boveri Rev.
- Journal Volume
- 74
- Journal Issue
- 1
- Series
- Brown Boveri Rev.
- Journal Page Range
- 20-26
- ISSN
- 0007-2486
- CODEN
- BRBOA
INIS
- Country of Publication
- Switzerland
- Country of Input or Organization
- Switzerland
- INIS RN
- 18076888
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- AVAILABILITY; ELECTRIC POWER; LEIBSTADT REACTOR; NUCLEAR POWER PLANTS; OPERATION; PERFORMANCE
- Descriptors DEC
- BWR TYPE REACTORS; ENRICHED URANIUM REACTORS; NUCLEAR FACILITIES; POWER; POWER PLANTS; POWER REACTORS; REACTORS; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS