General Approach and Element for Estimating Decommissioning Cost
Creators
- 1. Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)
Description
This paper will briefly introduce the general approach and element for developing the decommissioning cost. The ultimate objective of the estimate is to assure adequate funding for decommissioning. The decommissioning cost estimating is highly dependent on the strategies and cost methodologies. The method most widely adopted internationally in estimating is the bottom-up technique, based on a building block approach known as the WBS. Therefore, cost estimator should consider various approaches and elements of cost estimation to achieve the ascension of accuracy. Cost estimation for the decommissioning of nuclear facilities has tended to vary considerably in format and content reflecting a variety of approaches both within and between countries. These differences do not facilitate the process of reviewing estimates and make comparisons between different estimates more complicated. The joint study of OECD/NEA, IAEA and EU was undertaken to propose a standard itemization of decommissioning costs either directly for the production of cost estimates or for mapping estimates onto a standard, common structure for purposes of comparison
Additional details
Publishing Information
- Publisher
- KNS
- Imprint Place
- Daejeon (Korea, Republic of)
- Imprint Title
- Proceedings of the KNS 2014 spring meeting
- Imprint Pagination
- [1 CD-ROM]
- Journal Page Range
- [2 p.]
Conference
- Title
- 2014 spring meeting of the KNS
- Dates
- 28-30 May 2014
- Place
- Jeju (Korea, Republic of)
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 46050290
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ACCURACY; COST ESTIMATION; DECOMMISSIONING; NUCLEAR FACILITIES; PRODUCTION
Optional Information
- Notes
- 5 refs