INTRAVAL Phase 2 WIPP 1 test case report: Modeling of brine flow through halite at the Waste Isolation Pilot Plant site

Description

This report describes the WIPP 1 test case studied as part of INTRAVAL, an international project to study validation of geosphere transport models. The WIPP 1 test case involved simulation of measured brine-inflow rates to boreholes drilled into the halite strata surrounding the Waste Isolation Pilot Plant repository. The goal of the test case was to evaluate the use of Darcy's law to describe brine flow through halite. The general approach taken was to try to obtain values of permeability and specific capacitance that would be: (1) consistent with other available data and (2) able to provide reasonable simulations of all of the brine-inflow experiments performed in the Salado Formation. All of the teams concluded that the average permeability of the halite strata penetrated by the holes was between approximately 10-22 and 10-21 m2. Specific capacitances greater than 10-10 Pa-1 are inconsistent with the known constitutive properties of halite and are attributed to deformation, possibly ongoing, of the halite around the WIPP excavations. All project teams found that Darcy-flow models could replicate the experimental data in a consistent and reasonable manner. Discrepancies between the data and simulations are attributed to inadequate representation in the models of processes modifying the pore-pressure field in addition to the experiments themselves, such as ongoing deformation of the rock around the excavations. Therefore, the conclusion from the test case is that Darcy-flow models can reliably be used to predict brine flow to WIPP excavations, provided that the flow modeling is coupled with measurement and realistic modeling of the pore-pressure field around the excavations. This realistic modeling of the pore-pressure field would probably require coupling to a geomechanical model of the stress evolution around the repository

Availability note (English)

Available from INIS in electronic form and/or on microfiche ; Also available from OSTI as DE97007435; NTIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
125 p.
Report number
SAND--97-0788

Optional Information

Contract/Grant/Project number
Contract AC04-94AL85000
Funding organization
USDOE, Washington, DC (United States).