Published August 1984 | Version v1
Report Restricted

Proposed changes in intermediate pipe break criteria

Creators

Description

Bechtel Power Corporation proposed to the US NRC in 1983 that the NRC eliminate from their criteria all intermediate breaks. Bechtel's rationale for the proposal and support for their position are presented

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Title
CSNI specialist meeting on leak-before-break in nuclear reactor piping: proceedings
Journal Page Range
p. 524-528.
Report number
NUREG/CP--0051

Conference

Title
CSNI leak-before-break conference.
Dates
1-2 Sep 1983.
Place
Monterey, CA (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
16068225
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
CRACKS; FAILURES; FRACTURE MECHANICS; FRACTURES; LEAKS; LOSS OF COOLANT; NUCLEAR POWER PLANTS; PIPES; REACTOR COOLING SYSTEMS; REACTOR SAFETY; RESTRAINTS; STRESSES
Descriptors DEC
ACCIDENTS; COOLING SYSTEMS; MECHANICS; NUCLEAR FACILITIES; POWER PLANTS; REACTOR ACCIDENTS; REACTOR COMPONENTS; SAFETY; THERMAL POWER PLANTS