Economical and technical optimization of site investigations - a multivariate approach based on Stripa F1 and F2 borehole information
Creators
- 1. EMX Drilltech AB, Luleaa (Sweden)
Description
In this report multivariate analysis is presented and used as a tool to optimize site investigations. The technique is tested on earlier accumulated data from bore hole F1 and F2 in the Stripa mine, in an attempt to predict the hydraulic conductivity of the rock. Different investigation methods can be selected only on behalf of their correlation to the hydraulic conductivity and accurate predictions can be made with as high resolution as the core mapping data and the data from the geophysical logging allows. In the second part of the report the integration of this technique in the pre-investigation is discussed. The most important steps is to form a site analysis group, responsible for data collection, analysis and investigation, utilize all at the time available data to improve the investigation. This will also lead to a less rigid and more flexible pre-investigation that will improve the quality and reduce time consumption. (12 refs.)(au)
Availability note (English)
MF available from INIS under the Report Number.Files
23078605.pdf
Files
(1.6 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:2140384700eaae815a822d9dcdb68a92
|
1.6 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 79 p.
- Report number
- STRIPA-TR--92-04
INIS
- Country of Publication
- Sweden
- Country of Input or Organization
- Sweden
- INIS RN
- 23078605
- Subject category
- S58: GEOSCIENCES; S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Resource subtype / Literary indicator
- Numerical Data
- Descriptors DEI
- BOREHOLES; ECONOMICS; EXPERIMENTAL DATA; GEOLOGY; GEOPHYSICS; HYDRAULIC CONDUCTIVITY; OPTIMIZATION; RADIOACTIVE WASTE DISPOSAL; SITE SURVEYS; UNDERGROUND DISPOSAL
- Descriptors DEC
- CAVITIES; DATA; INFORMATION; MANAGEMENT; NUMERICAL DATA; WASTE DISPOSAL; WASTE MANAGEMENT