Published July 1986 | Version v1
Journal article

The Sizewell 'B' PWR - and the relative merits of the AGR

  • 1. Central Electricity Generating Board, Suffolk (UK). Sizewell Nuclear Power Station

Description

In this second part of the article, plant performance is discussed and then output, economics, design evolution and business opportunities are considered. The load factors of the PWRs achieved in 1985 in countries with a significant number of PWRs shows that performance in the United States is not as good as in Western Europe and Japan. However, the 4-loop PWR in the USA has performed better, with Callaway and Wolf Creek operating well. These plants form the basis for the UK design of Sizewell-B. The availability that can be expected from Sizewell-B and a new AGR are compared. The reasons for proposing a PWR at Sizewell-B are based on comparison with the AGR design and are given. (UK)

Additional details

Additional titles

Subtitle (English)
Pt. 2

Publishing Information

Journal Title
Chart. Mech. Eng.
Journal Volume
33
Journal Issue
7-8
Series
Chart. Mech. Eng.
Journal Page Range
32-35
ISSN
0009-191X
CODEN
CHMGA