Published 1995 | Version v1
Miscellaneous Open

Primary heat transport pump mechanical seal replacement strategy for Pickering B

Creators

  • 1. Ontario Hydro, Pickering, ON (Canada)

Description

Pickering Nuclear Generating Station is a CANDU PHWR eight unit station located on Lake Ontario. The station is divided into Pickering A (Units 1 to 4) and Pickering B (Units 5 to 8). Pickering B is the focus of this paper. Each unit is rated at 540 MWe. The Primary Heat Transport (PHT) system, which is used to cool the fuel, is divided into four quadrants. Each quadrant has four vertical Byron Jackson PHT main circulation pumps. Three pumps in each quadrant are required for normal operation, leaving one pump in each quadrant as a spare. Each Pickering PHT pump has a Byron Jackson Type SU two stage mechanical seal. The typical pressure breakdown across the seal is 8.7-4.5-1.0 MPa. Certain features of seal operation and the PHT system which influence seal replacement are discussed below. (author)

Files

29054821.pdf

Files (59.4 kB)

Name Size Download all
md5:e5d7fe4b22584e60aa969b06d595783b
59.4 kB Preview Download
Part of:
Proceedings of the third international conference on CANDU maintenance

Additional details

Publishing Information

Imprint Title
Proceedings of the third international conference on CANDU maintenance
Imprint Pagination
473 p.
Journal Page Range
p. 333-334
Report number
INIS-CA--0018

Conference

Title
3. International conference on CANDU maintenance
Dates
19-21 Nov 1995
Place
Toronto, ON (Canada)

Optional Information