Published October 2012 | Version v1
Miscellaneous

Reliability assurance program for the APR1400 DC

  • 1. KHNP Central Research Institute, Daejeon (Korea, Republic of)
  • 2. KEPCO E and C, Yongin (Korea, Republic of)
  • 3. Maracor Technical Services, IL (United States)

Description

KHNP is preparing the APR1400 design for U.S.NRC Design Certification (DC), for which the reference plant is Shin Kori units 3 and 4, by applying the code and standards of NRC issued before submitting the APR1400 design control documents. One of the important design activities, comparing to the licensing of the domestic licensing of new plants, is the requirement for Reliability Assurance Program (RAP). RAP is required in RG 1.206 and the associated acceptance criteria is described in SRP 17.4 and ISG DC/COL ISG 018. The RAP for the APR1400 during the design phase is performed in accordance with the U.S. regulatory requirements and associated guides. This paper provides the methodology, implementation process, and preliminary results of the APR1400 RAP

Part of:
Proceedings of the KNS autumn meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS autumn meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2012 autumn meeting of the KNS
Dates
24-26 Oct 2012
Place
Kyoungju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
44062858
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
CONTROL; DESIGN; LICENSING; PWR TYPE REACTORS; QUALITY ASSURANCE; REGULATIONS; RELIABILITY
Descriptors DEC
ENRICHED URANIUM REACTORS; LAWS; POWER REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information

Notes
10 refs