Published 2002
| Version v1
Miscellaneous
Open
The decision making of an electric power producer
Creators
- 1. Electricite de France (EDF), Serv. Strategie Production Valorisation, 93 - Saint Denis (France)
Description
How can choose an electric power producer when he has to decide an investment of a supplementary power plant? Which were the criteria to choose a small or a medium power reactor? In this framework, the economical profitability, the technical feasibility and the associated risks are discussed. (A.L.B.)
Availability note (English)
Available from INIS in electronic formFiles
33048059.pdf
Files
(233.2 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:67c2cd1c876f45494a883489b1804204
|
233.2 kB | Preview Download |
Additional details
Additional titles
- Original title (French)
- Les elements de decision d'un producteur d'electricite
Publishing Information
- Imprint Pagination
- 11 p.
- Report number
- INIS-FR--1363
Conference
- Title
- Conference on small and medium power reactors for the energy production
- Original Conference Title
- Conference sur les reacteurs de petite et moyenne puissance pour la production d'energie
- Dates
- 11-12 Dec 2001
- Place
- Paris (France)
INIS
- Country of Publication
- France
- Country of Input or Organization
- France
- INIS RN
- 33048059
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- DECISION MAKING; ECONOMIC ANALYSIS; ELECTRIC POWER; ELECTRIC POWER INDUSTRY; ELECTRIC UTILITIES; INVESTMENT; NUCLEAR ENERGY
- Descriptors DEC
- ECONOMICS; ENERGY; INDUSTRY; POWER; PUBLIC UTILITIES