Published 1986
| Version v1
Journal article
Peach bottom recirculation piping replacement ALARA program
Description
In late 1983, Philadelphia Electric Company (PECo) began detailed planning to replace the recirculation, residual heat removal, and part of the reactor water cleanup piping of the Peach Bottom Unit 2 reactor. Included in this work was an estimate of the collective exposure expected during piping replacement. That initial estimate, 1945 man-rem, is compared with the actual collective dose incurred during the piping replacement program. Also included are the exposures incurred during two additional tasks (safe end replacement and recirculation pump disassembly and decontamination) not considered in the initial estimate
Additional details
Publishing Information
- Journal Title
- Trans. Am. Nucl. Soc.
- Journal Volume
- 52
- Series
- Trans. Am. Nucl. Soc.
- Journal Page Range
- 550-551
- ISSN
- 0003-018X
- CODEN
- TANSA
Conference
- Title
- American Nuclear Society annual meeting.
- Dates
- 15-20 Jun 1986.
- Place
- Reno, NV (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 18065804
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- AFTER-HEAT REMOVAL; ALARA; DECONTAMINATION; EDUCATION; PEACH BOTTOM-1 REACTOR; PEACH BOTTOM-2 REACTOR; PEACH BOTTOM-3 REACTOR; PIPES; PRIMARY COOLANT CIRCUITS; PUMPS; RADIATION DOSES; RADIATION PROTECTION; REACTOR MAINTENANCE; SEPARATION PROCESSES; VALVES; WELDED JOINTS
- Descriptors DEC
- BWR TYPE REACTORS; CLEANING; CONTROL EQUIPMENT; COOLING SYSTEMS; ENRICHED URANIUM REACTORS; EQUIPMENT; FLOW REGULATORS; GAS COOLED REACTORS; GRAPHITE MODERATED REACTORS; HELIUM COOLED REACTORS; HTGR TYPE REACTORS; JOINTS; MAINTENANCE; POWER REACTORS; REACTOR COMPONENTS; REACTOR COOLING SYSTEMS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Secondary number(s)
- CONF-860610--.