Published June 1977 | Version v1
Journal article

Synchronous transfer of beam from the booster to the main ring in the KEK proton synchrotron

  • 1. National Lab. for High Energy Physics, Ibaraki, Japan

Description

The KEK main ring is filled with nine successive beam pulses from the fast cycling booster synchrotron during the injection. Booster bunches are synchronously transferred into stationary rf buckets of the main ring preserving the booster rf structure. At the transfer, longitudinal phase and momentum of the beam bunch extracted from the booster are matched to those defined in the main ring within errors of Vertical bar Delta Phi Vertical bar approximately 100 and Vertical bar Delta p/p Vertical bar approximately 4 x 10-4

Additional details

Identifiers

Publishing Information

Journal Title
IEEE Transactions on Nuclear Science
Journal Volume
24
Journal Issue
3
Series
IEEE Trans. Nucl. Sci.
Journal Page Range
1461-1463
ISSN
0018-9499

Conference

Title
Particle accelerator conference.
Dates
16 Mar 1977.
Place
Chicago, IL, USA.

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
9363275
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM INJECTION; CONTROL SYSTEMS; ELECTROMAGNETS; KEK SYNCHROTRON; PARTICLE BOOSTERS; PHASE SPACE; RF SYSTEMS
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; ELECTRICAL EQUIPMENT; MAGNETS; MATHEMATICAL SPACE; SPACE; SYNCHROTRONS

Optional Information

Notes
Updated automatically by Metadata and Full-Text Enrichment Agent