Published June 1977
| Version v1
Journal article
Synchronous transfer of beam from the booster to the main ring in the KEK proton synchrotron
Creators
- 1. National Lab. for High Energy Physics, Ibaraki, Japan
Description
The KEK main ring is filled with nine successive beam pulses from the fast cycling booster synchrotron during the injection. Booster bunches are synchronously transferred into stationary rf buckets of the main ring preserving the booster rf structure. At the transfer, longitudinal phase and momentum of the beam bunch extracted from the booster are matched to those defined in the main ring within errors of Vertical bar Delta Phi Vertical bar approximately 100 and Vertical bar Delta p/p Vertical bar approximately 4 x 10-4
Additional details
Identifiers
Publishing Information
- Journal Title
- IEEE Transactions on Nuclear Science
- Journal Volume
- 24
- Journal Issue
- 3
- Series
- IEEE Trans. Nucl. Sci.
- Journal Page Range
- 1461-1463
- ISSN
- 0018-9499
Conference
- Title
- Particle accelerator conference.
- Dates
- 16 Mar 1977.
- Place
- Chicago, IL, USA.
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 9363275
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BEAM INJECTION; CONTROL SYSTEMS; ELECTROMAGNETS; KEK SYNCHROTRON; PARTICLE BOOSTERS; PHASE SPACE; RF SYSTEMS
- Descriptors DEC
- ACCELERATORS; CYCLIC ACCELERATORS; ELECTRICAL EQUIPMENT; MAGNETS; MATHEMATICAL SPACE; SPACE; SYNCHROTRONS
Optional Information
- Notes
- Updated automatically by Metadata and Full-Text Enrichment Agent