Published January 1996 | Version v1
Report Open

Technical basis for instrumentation and control design improvements in WWER-440/230 nuclear power plants. A publication of the extrabudgetary programme on the safety of WWER and RBMK nuclear power plants

Description

Instrumentation and control (I and C) has been recognized as an area which requires substantial improvements in WWER NNPs, particularly for model 230 plants. Under contract with the IAEA the Spanish company Empresarios Agrupados (EA) developed a basic document proposing a technical basis for improvements related to the following most significant aspects of I and C: criteria for safety classification; remote shutdown panel; I and C support to operation and control room design; instrumentation set point margins; accident monitoring instrumentation. This publication is derived from the original report of EA which was circulated by the IAEA for review by staff members and experts from various Member States. It was finally agreed upon at a Consultants' meeting convened by the IAEA in Vienna in May 1994 with the participation of experts from France, Germany and Spain. The guidance expressed in this report is based on the IAEA/NUSS standards, safety guides and practices, and on regulations in use in various Member States. It is proposed as a way of carrying out the necessary studies to improve safety by upgrading the vital part of instrumentation an control in WWER-440 model 230 nuclear power plants. 28 refs, 3 figs

Availability note (English)

MF available from INIS under the Report Number.

Files

28047165.pdf

Files (1.4 MB)

Name Size Download all
md5:4989767cb7e211eaf82d59baea4b1183
1.4 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
100 p.
Report number
IAEA-EBP-WWER--02