Published March 10, 1975 | Version v1
Report

Extreme load analyses of the 100-K fuel storage basins and clearwells

Description

The 105-KE storage basin is being renovated under Project H-501 in order to provide supplemental storage for irradiated fuel from N Reactor. The 100-K plant was designed and constructed under structural design criteria somewhat different than those applicable to Project H-501. The purpose of this report is to document the results of a structural design review based upon current (H-501) criteria. Included are the results of seismic analyses of the 105-KE fuel storage basin and the 105-KE clearwells, as well as analyses involving extreme loads caused by events such as a tornado or the accidental dropping of a fuel cask into the storage basin. Except for minor details, the results would also be applicable to corresponding facilities at the KW facility

Availability note (English)

MF available from INIS under the Report Number.

Additional details

Publishing Information

Imprint Pagination
36 p.
Report number
UNI--287

Optional Information

Notes
Available from NTIS. $4.00.