Published February 6, 2002 | Version v1
Report Restricted

Fusion Power Deployment

Description

Fusion power plants could be part of a future portfolio of non-carbon dioxide producing energy supplies such as wind, solar, biomass, advanced fission power, and fossil energy with carbon dioxide sequestration. In this paper, we discuss key issues that could impact fusion energy deployment during the last half of this century. These include geographic issues such as resource availability, scale issues, energy storage requirements, and waste issues. The resource needs and waste production associated with fusion deployment in the U.S. should not pose serious problems. One important feature of fusion power is the fact that a fusion power plant should be locatable within most local or regional electrical distribution systems. For this reason, fusion power plants should not increase the burden of long distance power transmission to our distribution system. In contrast to fusion power, regional factors could play an important role in the deployment of renewable resources such as wind, solar and biomass or fossil energy with CO2 sequestration. We examine the role of these regional factors and their implications for fusion power deployment

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00796123; PURL: https://www.osti.gov/servlets/purl/796123-fSZOi5/native/

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
13 p.
Report number
PPPL--3669

Optional Information

Contract/Grant/Project number
AC02-76CH03073
Funding organization
USDOE Office of Science (United States)