Published June 1991 | Version v1
Report Restricted

Characterization/decision analysis report for the ICPP-603 chloride removal system

Description

Westinghouse Idaho Nuclear Company, Inc. (WINCO) has completed a physical, chemical, and radiological characterization of the CPP-603 (annex) Chloride Removal System (CRS) located at the Idaho Chemical Processing Plant (ICPP). In addition, a decision analysis was performed and the preferred method of decommissioning the CRS was identified. This method consists of removing all equipment and fixtures from the annex, decontaminating the annex to ALARA levels, and sealing the annex from the CPP-603 fuel storage basin. This report describes the CRS equipment and its operating history. General radiation fields inside the filter room were measured and representative samples were taken and analyzed to identify any radioisotopes or RCRA constituents and determine their concentrations. Also, waste volumes were estimated for each decommissioning alternative considered. 11 figs., 9 tabs

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE91017798; NTIS; INIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
24 p.
Report number
WINCO--1089

Optional Information

Contract/Grant/Project number
Contract AC07-84ID12435
Funding organization
USDOE, Washington, DC (United States).