Published 1981
| Version v1
Report
Restricted
Role of benchmarking in assessing the capability to predict room response in bedded salt repositories
Description
An overview is presented of the Waste Isolation Pilot Plant (WIPP) Benchmark II study which was used to assess the accuracy and reliability of computer codes used to predict drift response. Emphasis is placed on the objectives and philosophy of Benchmark II and on procedures used to ensure that valid comparisons of results could be made. The problem definition, the selection of participants, and review procedures are all discussed. A sampling of results is also presented to illustrate the degree of variability in the results obtained with various computer codes
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A02/MF A01.
Files
Additional details
Publishing Information
- Imprint Pagination
- 22 p.
- Report number
- SAND--81-1293C
Conference
- Title
- OECD Nuclear Energy Agency workshop on near-field phenomena in geologic respositories for radioactive waste.
- Dates
- 31 Aug - 3 Sep 1981.
- Place
- Seattle, WA, USA.
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 12642566
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BENCHMARKS; COMPUTER CALCULATIONS; COMPUTER CODES; CREEP; DRIFT INSTABILITY; NEW MEXICO; PILOT PLANTS; RADIOACTIVE WASTE DISPOSAL; SALT DEPOSITS; STRESSES; UNDERGROUND DISPOSAL
- Descriptors DEC
- FUNCTIONAL MODELS; GEOLOGIC DEPOSITS; INSTABILITY; MANAGEMENT; MECHANICAL PROPERTIES; NORTH AMERICA; PLASMA INSTABILITY; PLASMA MICROINSTABILITIES; USA; WASTE DISPOSAL; WASTE MANAGEMENT
Optional Information
- Secondary number(s)
- CONF-810861--3.