High-temperature process heat. Interim design and cost status report, FY 1981

Description

Studies conductd on HTGR systems in FY 1980 were concluded in Application Study Reports to describe the preconceptual system designs to that point and discuss possible applications for three variations of the systems; the steam cycle/cogeneration plant, the higher temperature reformer plant, and the gas turbine concept. The HTGR-Reformer Application Study was conceived and directed to evaluate the HTGR-R with a core outlet temperature of 8500C as a near-term Lead Project and as a vehicle to long-term HTGR Program Objectives. The scope of this effort included evaluations of the HTGR-R technology, evaluation of potential HTGR-R markets, assesment of the economics of commercial HTGR-R plants, and the evaluation of the program scope and expenditures necessary to establish HTGR-R technology through the completion of the Lead Project

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A02/MF A01 as DE82008549.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
16 p.
Report number
DOE/SF/02034--T55