Published October 1997 | Version v1
Report Open

Notes on safety modernization of nuclear power plants in Sweden

Creators

  • 1. ES-Konsult, Taeby (Sweden)

Description

Investment programmes are pursued for all reactor generations in the order of 70M USD per year and unit, despite the political decision to phase out nuclear power. 15-20% of this may be safety-related. Major redesign and replacements of piping and joints in the primary system of Ringhals-1 (1:st generation BWR, external pump loops) are under-way aimed at enhancing the barrier reliability at par with with the new reactors with internal circulation pumps. Major upgrading in process control are typically on the agenda, e.g. modern digital protection and control systems as installed in Ringhals 1 and 2 in 1995. Comprehensive modernization of the control rooms are planned for all Swedish reactors, commencing in 1997 with the Forsmark reactors. The needs for modernization in regard of safety are expected to be further clarified in the design basis reviews due for completion in 1998

Files

29015607.pdf

Files (466.5 kB)

Name Size Download all
md5:99b707fc48ffdb9cc28fef0366549e14
466.5 kB Preview Download
Part of:
Seminar proceedings. Seminar on piping reliability

Additional details

Publishing Information

Imprint Title
Seminar proceedings. Seminar on piping reliability
Imprint Pagination
360 p.
Journal Page Range
p. 2.1-2.20.
ISSN
1104-1374
Report number
SKI-R--97-32

Conference

Title
Seminar on piping reliability.
Dates
30 Sep - 1 Oct 1997.
Place
Sigtuna (Sweden).

INIS

Country of Publication
Sweden
Country of Input or Organization
Sweden
INIS RN
29015607
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
CRACKS; PIPE JOINTS; PIPES; REACTOR SAFETY; RELIABILITY; SWEDEN
Descriptors DEC
DEVELOPED COUNTRIES; EUROPE; JOINTS; SAFETY; SCANDINAVIA; WESTERN EUROPE

Optional Information