Published 1998 | Version v1
Book

Key points of condenser refurbishment illustrated by our experience on Russian technology nuclear power stations

Creators

Description

In 1990, the refurbishment of the condensers of the VVER 440 MW LOVIISA 2 Finnish power station was the first reference of GEC ALSTHOM Delas on a Russian type nuclear power station, covering the optimization studies, technical and-economical choices, manufacture and site operations. The current contract for the condenser renovation of the 4 units of the VVER 440 MW PAKS Hungarian power station goes even further through an investment of this company in a local manufacturing installation and a significant participation of the local industry. Their expertise has helped reducing site operation times from 28 days for one condenser of one Loviisa unit, to 26 days for two condensers of one Paks unit. This paper describes the various aspects and the improvements brought for both operations and highlights the technical and economical key advantages of a condenser renovation (quick return on investment, better performances, reliability and life extension of the power station)

Additional details

Publishing Information

Publisher
PennWell Conferences and Exhibitions
Imprint Place
Houston, TX (United States)
Imprint Title
Power-gen Europe'98
Imprint Pagination
[2400 p.]
Journal Page Range
p. 10, Paper, 54

Conference

Title
Power-Gen Europe'98
Dates
9-11 Jun 1998
Place
Milan (Italy)

Optional Information

Notes
Imprint:1 CD-ROM. Operating Systems: Windows 3.1, '95, '98 and NT; Macintosh; and UNIX
Secondary number(s)
CONF-9806214--