Published February 1985 | Version v1
Report Open

Oak Ridge Research Reactor quarterly report, April, May, and June 1984

Description

The ORR operated at an average power level of 29.9 MW for 83.3% of the time during this period. The reactor was shut down on five occasions, one of which was unscheduled. Reactor downtime needed for refueling and checks was normal. The reactor remained available for operation 93.4% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature. Special tests completed during the quarter included results of flux measurements in the HFED experiment, cycles 167-D and 168-A, and results of reactivity worth measurements of MFE-4A Hf core sleeve as installed in core position E-3. In-service inspection completed during the quarter included the internal and external inspection of the pool heat exchanger

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A03/MF A01 as DE85008747.

Files

16072227.pdf

Files (469.5 kB)

Name Size Download all
md5:93c343a02900722c496ba1376802bd07
469.5 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
27 p.
Report number
ORNL/TM--9435

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
16072227
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Progress Report
Descriptors DEI
IN-SERVICE INSPECTION; ORR REACTOR; REACTOR OPERATION; REACTOR SHUTDOWN
Descriptors DEC
ENRICHED URANIUM REACTORS; INSPECTION; OPERATION; REACTORS; SHUTDOWN; TANK TYPE REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS