Published February 1985
| Version v1
Report
Open
Oak Ridge Research Reactor quarterly report, April, May, and June 1984
Description
The ORR operated at an average power level of 29.9 MW for 83.3% of the time during this period. The reactor was shut down on five occasions, one of which was unscheduled. Reactor downtime needed for refueling and checks was normal. The reactor remained available for operation 93.4% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature. Special tests completed during the quarter included results of flux measurements in the HFED experiment, cycles 167-D and 168-A, and results of reactivity worth measurements of MFE-4A Hf core sleeve as installed in core position E-3. In-service inspection completed during the quarter included the internal and external inspection of the pool heat exchanger
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS, PC A03/MF A01 as DE85008747.Files
16072227.pdf
Files
(469.5 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:93c343a02900722c496ba1376802bd07
|
469.5 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 27 p.
- Report number
- ORNL/TM--9435
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 16072227
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Progress Report
- Descriptors DEI
- IN-SERVICE INSPECTION; ORR REACTOR; REACTOR OPERATION; REACTOR SHUTDOWN
- Descriptors DEC
- ENRICHED URANIUM REACTORS; INSPECTION; OPERATION; REACTORS; SHUTDOWN; TANK TYPE REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS