Published January 18, 1993 | Version v1
Miscellaneous

FIST/6PMC1, BWR/6-128 Isolation Valve (MSIV) Closure without Power Scram

Description

1 - Description of test facility: The FIST facility is scaled to a BWR/6-218 standard plant. A full size bundle with electrically heated rods is used to simulate the reactor core. A scaling ratio of 1/624 is applied in the design of the system components. Key features of the FIST facility include: (1) Full height test vessel and internals; (2) correctly scaled fluid volume distribution; (3) simulation of ECCS, S/RV, and ADS; (4) level trip capability; (5) heated feedwater supply system, which provides the capability for steady state operation. 2 - Description of test: Isolation Valve (MSIV) closure without power scram. HPCS and RCIC are assumed to be functional.The power transient test simulation is based on a transient code calculation for a BWR

Availability note (English)

Available on-line: http://www.nea.fr/abs/html/csni0056.html

Additional details

Publishing Information

Imprint Pagination
[html]

INIS

Optional Information

Notes
2 refs.; This record replaces 40013881