Plan of intakes for establish more Shimane-3 in Shimane Nuclear Power Plant

  • 1. Chugoku Electric Power Co., Inc., Hiroshima (Japan)

Description

Shimane-3 reactor (ABWR) has been constructed to aim at operating in December, 2011. Outline of intakes works are stated. The environmental loads and cost were reduced by changing intake works from the embedded steel pipe method to the undersea tunnel method. Plan of intakes, development of Pneumatic Caisson intake, and investigation of bedrock of submarine in the surrounding of intake are reported. The construction planning of Pneumatic Caisson intake consists of the foundation work, installation of intake unit, connection of intake tunnels and flow of water. The uniformity intake structure was investigated by the hydraulic model tests and the numerical analysis. Dredging of rocks in the foundation spot of intake and construction of intakes on land are under construction. A construction work plan, design for intakes, the embedded steel pipe method, the undersea tunnel method, Pneumatic Caisson intake, topographic features and intake tanks are illustrated. (S.Y.)

Additional details

Publishing Information

Journal Title
Denryoku Doboku
Journal Volume
331
Journal Issue
9
Journal Page Range
p. 44-48
ISSN
0386-2895