Published June 1995 | Version v1
Report Open

AECB staff annual assessment of the Bruce B Nuclear Generating Station for the year 1994

Description

AECB staff believes Ontario Hydro operated Bruce B safely in 1994. The Bruce B reactors will remain limited to 88% full power until Ontario Hydro is able to demonstrate that it is safe to operate at higher powers. Ontario Hydro's compliance with AECB regulations and the Operating Licence was satisfactory. AECB found no major violations. The station performance was similar to previous years. Radiation doses to workers and the public were well below the legal limits and also remained below Ontario Hydro's internal targets. Worker radiation doses increased slightly but were comparable to previous years. Inspection of pressure tubes and steam generator tubes by Ontario Hydro showed continuing tube degradation. However, we believe that Ontario Hydro made progress in correcting and managing these problems. Ontario Hydro carried out a full-scale fire drill at Bruce B in 1994. AECB witnessed the drill and were pleased to observe a significant improvement in the station's fire-fighting capability. 7 tabs., 4 figs

Availability note (English)

MF available from INIS under the Report Number.

Files

27032041.pdf

Files (517.1 kB)

Name Size Download all
md5:1d173590318a7151993d44ce3bd273ca
517.1 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
32 p.
Report number
INFO--0560