Published August 2006 | Version v1
Miscellaneous

Bunch compression using the transport line and short bunch revolving in NewSUBARU

  • 1. Japan Synchrotron Radiation Research Institute (JASRI/SPring-8), Sayo, Hyogo (Japan)
  • 2. University of Hyogo, Laboratory of Advanced Science and Technology for Industry, Kamigori, Hyogo (Japan)

Description

We have demonstrated the idea of circulating a short, intense linac bunch for some tens of turns in an isochronous ring. We compressed a bunch from the SPring-8 linac to a few picoseconds rms by means of an energy compression system and a beam transport line from the linac to NewSUBARU. The NewSUBARU storage ring was set to a quasi-isochronous conduction and the bunch circulated for some tens of turns after injection while maintaining the short bunch length. (author)

Part of:
The 3rd annual meeting of Particle Accelerator Society of Japan and the 31th Linear Accelerator Meeting in Japan. Proceedings

Additional details

Identifiers

Publishing Information

Imprint Title
The 3rd annual meeting of Particle Accelerator Society of Japan and the 31th Linear Accelerator Meeting in Japan. Proceedings
Imprint Pagination
819 p.
Journal Page Range
p. 744-746

Conference

Title
3. annual meeting of Particle Accelerator Society of Japan; 31. Linear Accelerator Meeting in Japan
Dates
2-4 Aug 2006
Place
Sendai, Miyagi (Japan)

INIS

Country of Publication
Japan
Country of Input or Organization
Japan
INIS RN
41022929
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BEAM BUNCHING; BEAM TRANSPORT; COMPRESSION; ELECTRON BEAM INJECTION; ELECTRON BEAMS; LINEAR ACCELERATORS; OPTIMIZATION; PERFORMANCE TESTING; PULSE TECHNIQUES; STORAGE RINGS; STREAK CAMERAS; SYNCHROTRON RADIATION SOURCES
Descriptors DEC
ACCELERATORS; BEAM DYNAMICS; BEAM INJECTION; BEAMS; CAMERAS; DYNAMICS; LEPTON BEAMS; MECHANICS; PARTICLE BEAMS; RADIATION SOURCES; TESTING

Optional Information

Notes
1 ref., 7 figs.