Published 1984
| Version v1
Report
Restricted
Watts Bar preventive maintenance program. Lectures 28.8.1-3
Description
This discussion about preventive maintenance (PM) at Watts Bar begins with how the plant sections are organized. The plant organization was a determining factor in how the preventive maintenance program was structured. Watts Bar has three maintenance sections - Mechanical, Electrical, and Instrument - that perform both corrective maintenance and preventive maintenance. In addition, there is an Engineering and Test Unit that performs vibration analyses and performance monitoring
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS, PC A03/MF A01; 1 as DE84901140.
Files
Additional details
Publishing Information
- Imprint Pagination
- 28 p.
- Report number
- TVA/OP/NP--84/4
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 16003122
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- REACTOR MAINTENANCE; WATTS BAR-1 REACTOR; WATTS BAR-2 REACTOR
- Descriptors DEC
- ENRICHED URANIUM REACTORS; MAINTENANCE; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS