Published July 1985 | Version v1
Journal article

Operations analysis of the unscheduled summer machine opening of the Tokamak Fusion Test Reactor (TFTR) at the Princeton Plasma Physics Laboratory

  • 1. Plasma Physics Laboratory, Princeton, NJ

Description

During experimental operation, a problem developed with the mechanical integrity of the TFTR surface pumping system neutralizer plates that required a vacuum vessel entry for repairs. This problem, coupled with several less significant machine internal problems that had been developing, forced the decision to make an unscheduled vacuum vessel entry. An extended machine outage at that time would have had a severe impact on the experimental schedule. Therefore, the goal was to make repairs and return the vacuum vessel to a clean condition as quickly as possible. The total time required between the end of regularly scheduled activity and restoration of the machine capability to routinely obtain 1 MA disruption-free plasma was 12 days

Additional details

Publishing Information

Journal Title
Fusion Technol.
Journal Volume
8
Journal Issue
1
Series
Fusion Technol.
Journal Page Range
296-301
ISSN
0748-1896
CODEN
FUSTE

Conference

Title
6. topical meeting on the technology of fusion energy.
Dates
3-7 Mar 1985.
Place
San Francisco, CA (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
17075444
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
MAINTENANCE; OUTAGES; PLANNING; REPAIR; SCHEDULES; TFTR TOKAMAK; VACUUM SYSTEMS
Descriptors DEC
CLOSED PLASMA DEVICES; THERMONUCLEAR DEVICES; TOKAMAK DEVICES

Optional Information

Secondary number(s)
CONF-850310--.