Resolution of the direct containment heating issue for all Westinghouse plants with large dry containments or subatmospheric containments

Description

This report uses the scenarios described in NUREG/CR-6075 and NUREG/CR-6075, Supplement 1, to address the direct containment heating (DCH) issue for all Westinghouse plants with large dry or subatmospheric containments. DCH is considered resolved if the conditional containment failure probability (CCFP) is less than 0.1. Loads versus strength evaluations of the CCFP were performed for each plant using plant-specific information. The DCH issue is considered resolved for a plant if a screening phase results in a CCFP less than 0.01, which is more stringent than the overall success criterion. If the screening phase CCFP for a plant is greater than 0.01, then refined containment loads evaluations must be performed and/or the probability of high pressure at vessel breach must be analyzed. These analyses could be used separately or could be integrated together to recalculate the CCFP for an individual plant to reduce the CCFP to meet the overall success criterion of less than 0.1. The CCFPs for all of the Westinghouse plants with dry containments were less than 0.01 at the screening phase, and thus, the DCH issue is resolved for these plants based on containment loads alone. No additional analyses are required

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as TI96007153; NTIS; GPO.

Files

27054045.pdf

Files (7.2 MB)

Name Size Download all
md5:3f3464f94d8550606480dbe05d4ab544
7.2 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
238 p.
Report number
NUREG/CR--6338

Optional Information

Contract/Grant/Project number
Contract AC04-94AL85000
Funding organization
Nuclear Regulatory Commission, Washington, DC (United States).
Secondary number(s)
SAND--95-2381.