Published 2004
| Version v1
Book
Analysis on X-band structure breakdown at GLCTA
Creators
- 1. Tokyo Univ., Graduate School of Science, Dept. of Physics, Tokyo (Japan)
- 2. High Energy Accelerator Research Organization, Tsukuba, Ibaraki (Japan)
- 3. Tohoku Gakuin Univ., Division of Engineering, Course of Applied Physics, Miyagi (Japan)
- 4. Kanto Information Service, Tsuchiura, Ibaraki (Japan)
Description
We have built a new monitoring system for accelerator structure breakdown in the X-band high-gradient test facility at KEK (GLCTA: Global Linear Collider Test Accelerator). An X-band test structure KX01 (made by KEK) has been processed at GLCTA and we have been collecting data for about 3 months using this breakdown monitoring system. We describe overview of the monitoring system and preliminary result of breakdown analysis of the structure. (author)
Additional details
Publishing Information
- Publisher
- Particle Accelerator Society of Japan
- Imprint Place
- Tokyo (Japan)
- Imprint Title
- Proceedings of the 1st annual meeting of Particle Accelerator Society of Japan and the 29th Linear Accelerator Meeting in Japan
- Imprint Pagination
- 717 p.
- Journal Page Range
- p. 335-337
Conference
- Title
- 1. annual meeting of Particle Accelerator Society of Japan; 29. Linear Accelerator Meeting in Japan
- Dates
- 4-6 Aug 2004
- Place
- Funabashi, Chiba (Japan)
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 36037551
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ACCELERATION; ACOUSTIC MONITORING; ELECTRIC DISCHARGES; ELECTRIC FIELDS; FEASIBILITY STUDIES; LINEAR COLLIDERS; MICROWAVE POWER TRANSMISSION; PERFORMANCE TESTING; RF SYSTEMS; WAVEGUIDES
- Descriptors DEC
- ACCELERATORS; LINEAR ACCELERATORS; MONITORING; POWER TRANSMISSION; TESTING
Optional Information
- Notes
- 6 refs., 3 figs.